FPSO Penetration Isolation

Woodside - Okha FPSO

A pneumatic plug was inserted into a 50 mm diameter penetration to isolate a boiler blow down valve for an internal replacement of the valve. The plug was inserted and the valve was replaced in 6 hours with minimal disruption to the facility. The ROV control station and LARS was setup in the stores laydown on the aft of the FPSO vessel. 

Latest News

National Reconciliation Week | Strengthening Bonds

As part of National reconciliation week Vertech Group were proud and humbled to welcome a local elder to present a traditional welcome to country, host a smoking ceremony and introduce the Koolangkas Kreate dance group in support of strengthening relationships and our bond between Aboriginal and Torres Strait Islander people and our...

Wednesday 5th June 2019

Change of Ownership for Vertech Group

Vertech Group and Sonomatic over the years have collaboratively delivered complex and specialised projects across the Asia pacific. As an evolution of this partnership Vertech Group and Sonomatic become part of the same family with Sonomatic’s parent company acquiring a majority shareholding in Vertech group which incorporates Vertech, GeoOceans and Vertech New Zealand...

Wednesday 5th June 2019