ROV Pipeline Inspection - Wave Energy

Geo Oceans was engaged by Carnegie Wave Energy to perform pre and post construction ROV pipeline inspections for the Perth wave energy project (PWEP) off Garden Island in Western Australia.  

The ROV survey captured video, still images, positioning survey data and marine habitat data of the PWEP development area.

An engineer attended the survey and instructed the ROV on inspection of particular features. The survey locations included a 10m wide buffer area surrounding the pipeline alignment, three wave energy systems (CETO units) foundations and other areas of interest that were identified from existing bathymetry data. Benthic environmental data was also captured and processed using the GO Visions™ software system to satisfy several environmental survey requirements for the project. 

Latest News

National Reconciliation Week | Strengthening Bonds

As part of National reconciliation week Vertech Group were proud and humbled to welcome a local elder to present a traditional welcome to country, host a smoking ceremony and introduce the Koolangkas Kreate dance group in support of strengthening relationships and our bond between Aboriginal and Torres Strait Islander people and our...

Wednesday 5th June 2019

Change of Ownership for Vertech Group

Vertech Group and Sonomatic over the years have collaboratively delivered complex and specialised projects across the Asia pacific. As an evolution of this partnership Vertech Group and Sonomatic become part of the same family with Sonomatic’s parent company acquiring a majority shareholding in Vertech group which incorporates Vertech, GeoOceans and Vertech New Zealand...

Wednesday 5th June 2019